The Desmond PrestonIowa Department of Transportation used controlled explosives Sunday to remove the remaining parts of the old I-74 bridge, which connects Iowa and Illinois over the Mississippi River.
Certain areas were temporarily closed, including the new bridge, during the removal of suspension cables and towers on the old bridge, the Iowa DOT said on its website.
“The main navigation channel in the river will be closed to all river traffic for up to 24 hours,” the Iowa DOT said.
In June, the Iowa DOT removed parts of the old I-74 bridge in the first phase of the demolition. The new bridge was built because of “increased traffic volume” the Iowa DOT said.
The westbound bridge, Illinois to Iowa, opened in 1935. The eastbound bridge, Iowa to Illinois, opened in 1960.
The new bridge was built in July 2017 and was fully opened in December 2021.
The project cost about $1 billion in total, including engineering, design and construction costs.
2025-05-02 20:3187 view
2025-05-02 20:142059 view
2025-05-02 20:0253 view
2025-05-02 19:492976 view
2025-05-02 18:492222 view
Now wouldn’t this be a treat: Bill Belichick and Robert Kraft back together...as members of the Pro
The Pacific Northwest faces a multitude of major fires, blanketing the region in smoke and evacuatio
NASHVILLE, Tenn.—Michael Henry spent four years unhoused before securing an apartment at Andrew Jack